../
References

References

MMK Metallurgy

Gebze / Kocaeli Factory Steam Boiler Load Reducing Project

It is aimed to return 1200 kW of waste energy from the process water used in the facility to the system with a 147 kW heat pump unit. (COP 8.1) By reducing the load of the natural gas steam boiler in the facility, the return on investment was calculated as 1.6 years. The project is still going on.

References