../
References

References

Aslı Börek

Dudullu/ İstanbul Production Facility

+4°C Cold Rooms

-18 °C Frozen Rooms

+12 °C Preparation Rooms

Shocking Units

It was designed as a heat recovery project. 90% of the waste energy was recovered in response to the hot water demand. 45% energy savings were achieved throughout the facility. It has been working actively for 8 years.

References