
References
References
Aslı Börek
Dudullu/ İstanbul Production Facility
+4°C Cold Rooms
-18 °C Frozen Rooms
+12 °C Preparation Rooms
Shocking Units
It was designed as a heat recovery project. 90% of the waste energy was recovered in response to the hot water demand. 45% energy savings were achieved throughout the facility. It has been working actively for 8 years.
References